The training should cover all the capabilities of the new system so users understand what each module does.

A) True
B) False

Correct Answer

verifed

verified

False

Which of the following is included as a basic step in a change management plan?


A) convert data
B) install hardware
C) install software
D) motivate adoption
E) write plan

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

The conversion style that recommends operating the new system along side the old system for a trial period is known as _____.


A) direct
B) parallel
C) phased
D) pilot
E) simultaneous

F) B) and E)
G) A) and B)

Correct Answer

verifed

verified

Training should focus on everything the new system can do.

A) True
B) False

Correct Answer

verifed

verified

Postimplementation activities attempt to _____ the organization after the successful transition to the new system.


A) streamline
B) refreeze
C) down size
D) right size
E) improve

F) C) and E)
G) None of the above

Correct Answer

verifed

verified

Direct conversion, where the new system is turned on and the old system is immediately turned off, is the simplest and most straightforward method, but it is also the most risky because any problems with the new system may seriously disrupt the organization.

A) True
B) False

Correct Answer

verifed

verified

Institutionalization refers to using the new system as the normal, accepted, and routine way of performing the business processes.

A) True
B) False

Correct Answer

verifed

verified

The three-stage process for managing organizational change that was developed by Lewin is _____.


A) As-Is system, transition, and To-Be system
B) hold, shuffle, and fold
C) SDLC, RAD, and BPR
D) support, maintain, and assess
E) unfreeze, move, and refreeze

F) B) and C)
G) A) and D)

Correct Answer

verifed

verified

Enhancements suggested by users to make the system easier to use are given higher priority than bug fixes.

A) True
B) False

Correct Answer

verifed

verified

Install hardware, install software, and convert data are the three steps found in the _____.


A) change management process
B) conversion plan
C) direct conversion activity
D) file and database conversion
E) purchase or rent process

F) C) and D)
G) B) and E)

Correct Answer

verifed

verified

When an organization has one or more locations or units within a location converted first, this is called _____ conversion.


A) direct
B) parallel
C) phased
D) pilot
E) simultaneous

F) All of the above
G) B) and C)

Correct Answer

verifed

verified

D

The three major steps to the conversion plan before commencement of operations are to install hardware, install software, and convert data; usually these steps must be done sequentially at any one location.

A) True
B) False

Correct Answer

verifed

verified

Training for a business system should focus on _____.


A) all the capabilities of the new system
B) complex computerized modules and code
C) helping the users to accomplish their jobs
D) how to use the system
E) not using the system

F) C) and D)
G) D) and E)

Correct Answer

verifed

verified

The simultaneous direct conversion to SAP to replace all of your legacy systems would result in high risk while requiring an enormous amount of time.

A) True
B) False

Correct Answer

verifed

verified

A migration plan contains two major elements. They are _____.


A) challenging and motivation
B) change and assessment
C) conversion and testing
D) supportive and maintenance
E) technical and organizational

F) A) and C)
G) A) and D)

Correct Answer

verifed

verified

Cold turkey, big bang, and abrupt cut-over are alternative names for _____ conversion.


A) direct
B) parallel
C) phased
D) pilot
E) simultaneous

F) C) and D)
G) B) and E)

Correct Answer

verifed

verified

APS Systems would like to convert to the new system quickly. The ideal conversion strategy for APS Systems would be a conversion style of parallel and a modular conversion.

A) True
B) False

Correct Answer

verifed

verified

The conversion style is the way in which users are switched between the old and new systems. There are two fundamentally different approaches to the style of conversion: direct conversion and ______________________.


A) indirect conversion
B) parallel conversion
C) phased conversion
D) pilot conversion
E) simultaneous conversion

F) All of the above
G) C) and D)

Correct Answer

verifed

verified

B

Rather than attempting to teach the users all the features of the system, training should instead focus on the much smaller set of activities that users perform on a regular basis and ensure that users are truly expert in those.

A) True
B) False

Correct Answer

verifed

verified

Postimplementation activities include _____.


A) project assessment
B) system maintenance
C) system support
D) system support and system maintenance
E) system support, system maintenance, and project assessment

F) A) and E)
G) B) and C)

Correct Answer

verifed

verified

Showing 1 - 20 of 94